The Topic
The Evolution of Automated Safety Technologies
Related Topic
Many vehicles on the road today have driver assistance technologies, which help to save lives and prevent injuries on our nation's roads. While some driver assistance technologies are designed to warn you if you’re at risk of an impending crash, others are designed to take action to avoid a crash.
The continuing evolution of automotive technology, including driver assistance technologies and automated driving systems, aim to deliver even greater safety benefits.
A Vision for Safety: Learn More
Download NHTSA’s voluntary guidance, technical documentation, and additional resources related to automated vehicles.
1950 - 2000
Safety/Convenience Features
Cruise Control
Seat Belts
Antilock Brakes
2000 – 2010
Advanced Safety Features
Electronic Stability
Control
Blind Spot Detection
Forward Collision Warning
Lane Departure Warning
2010 – 2016
Advanced Driver Assistance Features
Rearview Video Systems
Automatic Emergency Braking
Pedestrian Automatic Emergency Braking
Rear Automatic Emergency Braking
Rear Cross Traffic Alert
Lane Centering Assist
2016 - 2025
Partially Automated Safety Features
Lane Keeping Assist
Adaptive Cruise Control
Traffic Jam Assist
2025+
Fully Automated Safety Features
The Topic
The Road to Full Automation
GRAPHIC
Cars and trucks that drive us — instead of us driving them — may offer transformative safety opportunities at their maturity. At this time, even the highest level of driving automation available to consumers requires the full engagement and undivided attention of drivers. There is considerable investment into safe testing, development and validation of automated driving systems. These automotive technology advancements also have the potential to improve equity, air pollution, accessibility and traffic congestion.
Vehicle safety promises to be one of automation's biggest benefits. Higher levels of automation, referred to as automated driving systems, remove the human driver from the chain of events that can lead to a crash. While these systems are not available to consumers today, the advantages of this developing technology could be far-reaching.
What is available to consumers today: active safety systems. These are types of advanced driver assistance systems, which provide lower levels of automation that can assist a driver by anticipating imminent dangers and working to avoid them.
Collectively, these technologies will help protect drivers and passengers, as well as bicyclists and pedestrians.
Mobility
While full societal benefits of automated driving systems are difficult to project, their transformative potential is recognized. Automated driving systems, at their maturity, could increase mobility for seniors and people with disabilities and expand transportation options for underrepresented communities. NHTSA encourages equity to be considered and addressed throughout the ADS infrastructure and vehicle design processes.
Economic and Societal Benefits
Automated technologies could deliver additional economic and societal benefits. A NHTSA study showed that motor vehicle crashes cost billions each year. Eliminating the majority of vehicle crashes through technology could reduce this cost.
ENVIRONMENTAL
The automotive industry is moving toward more automation and electrification, which both hold promise for further improvements in safety and better environmental practices. Vehicle automation will potentially change the need for individualized parking spaces and lots, with increased use of automated ride share and shuttle fleets, which could dramatically transform land use. Also, vehicle electrification opens up possibilities to improve efficiency with less personal driving, resulting in further reductions of air pollutants from the transport sector.
Efficiency and Convenience
Americans spent an estimated 6.9 billion hours in traffic delays in 2014, cutting into time at work or with family, increasing fuel costs and vehicle emissions. Automated driving systems have the potential to improve efficiency and convenience.
The Topic
Frequently Asked Questions
What are the safety benefits of automated vehicles?
Types of automated technologies, such as advanced driver assistance system technologies already in use on the roads and future automated driving systems at their mature state, have the potential to reduce crashes, prevent injuries, and save lives. In some circumstances, automated technologies may be able to detect the threat of a crash and act faster than drivers. These technologies could greatly support drivers and reduce human errors and the resulting crashes, injuries, and economic tolls.
I’ve heard stories about "self-driving" vehicles that have crashed. Why are they on the road?
There is no vehicle currently available for sale that is fully automated or "self-driving." Every vehicle currently for sale in the United States requires the full attention of the driver at all times for safe operation. While an increasing number of vehicles now offer some automated features designed to assist the driver under specific conditions, these vehicles are not fully automated.
Currently, states permit a limited number of “self-driving” vehicles to conduct testing, research, and pilot programs on public streets and NHTSA monitors their safety through its Standing General Order. NHTSA and USDOT are committed to overseeing the safe testing, development and deployment of these systems – currently in limited, restricted and designated locations and conditions.
How will I know automated driving systems are safe?
Vehicles are tested by the companies that build them. Companies must comply with Federal Motor Vehicle Safety Standards and certify that their vehicle is free of safety risks. Many companies today are testing vehicles with higher levels of automation to ensure that they operate as intended, but many experts indicate that more work remains to be done by developers to ensure their safe operation before they are available for consumers to purchase.
Will automated vehicles be more vulnerable to hacking?
Cybersecurity is a critical issue that USDOT and automotive companies are working to address for the future safe deployment of these technologies. Advanced vehicle safety technologies depend on an array of electronics, sensors, and computing power. In advancing these features and exploring the potential of full automation, USDOT and NHTSA are focused on cybersecurity to ensure that companies appropriately safeguard these systems to be resilient and work as intended. You can read more about our approach by visiting NHTSA's vehicle cybersecurity topic.
If a vehicle is driving itself, who is liable if the vehicle crashes? How is the vehicle insured?
It is vital to emphasize that drivers will continue to share driving responsibilities for the foreseeable future and must remain engaged and attentive to the driving task and the road ahead with the consumer available technologies today. However, questions about liability and insurance are among many important questions, in addition to technical considerations that, policymakers are working to address before automated driving systems reach their maturity and are available to the public.
Explain the different terms: automated driving system, automated vehicle and "self-driving" vehicle.
When discussing types of vehicles where a traditional driver would no longer be needed, NHTSA refers to them as automated driving systems. These types of vehicles have also been referred to as automated vehicles. NHTSA follows industry standards in not using the term "self-driving" to describe higher levels of automation, as this describes a vehicle's state of operation but not necessarily its capabilities and too often is falsely associated with how today's drivers need to interact with a vehicle.
NHTSA In Action
NHTSA is dedicated to advancing the lifesaving potential of new vehicle technologies
NHTSA demonstrates its dedication to saving lives on our nation’s roads and highways through its approach to the safe development, testing, and deployment of new and advanced vehicle technologies that have enormous potential for improving safety and mobility for all Americans.
NHTSA supports the Safe System Approach, a data-driven, holistic, and equitable method to roadway safety that fully integrates the needs of all users. As part of this approach, vehicle safety technologies offer unique opportunities to reduce traffic deaths, injuries, and harm.
In 2021, NHTSA issued a Standing General Order that requires manufacturers and operators of automated driving systems and SAE Level 2 advanced driver assistance systems equipped vehicles to report crashes to the agency.
In 2020, NHTSA launched Automated Vehicle Transparency and Engagement for Safe Testing. As part of the AV TEST initiative, states and companies can voluntarily submit information about testing of automated driving systems to NHTSA, and the public can view the information using NHTSA’s interactive tool.
In September 2016, NHTSA and the U.S. Department of Transportation issued the Federal Automated Vehicles Policy, which sets forth a proactive approach to providing safety assurance and facilitating innovation. Building on that policy and incorporating feedback received through public comments, stakeholder meetings, and Congressional hearings the agency issued Automated Driving Systems: A Vision for Safety.